Connect with us

Energy & Critical Metals

Basin Uranium/Skyharbour intersect more anomalous uranium at Mann Lake, Saskatchewan

Basin Uranium Corp. [NCLR-CSE; BURCF-OTC; 6NP0-FSE] and partner Skyharbour Resources Ltd. [SYH-TSXV; SYHBF-OTCQX; SC1P-FSE] reported…

Share this article:

Published

on

This article was originally published by Resource World

Basin Uranium Corp. [NCLR-CSE; BURCF-OTC; 6NP0-FSE] and partner Skyharbour Resources Ltd. [SYH-TSXV; SYHBF-OTCQX; SC1P-FSE] reported an intersection of significant mineralization from the three-hole Phase 2 drill program at the Mann Lake project located 25 km southwest of the McArthur River Mine and 15 km to the northeast along strike of Cameco’s Millennium uranium deposit, Athabasca basin, northern Saskatchewan.

A total of 6,279 metres of diamond drilling was completed on the Mann Lake property during the 2022 season.

Phase Two Drilling Highlights: Drilling continued to intersect notable pathfinder elements (B, Co, Cu, Ni, and Pb) which provides for vectoring towards uranium mineralization as it is typically associated with Athabasca Basin unconformity-style mineralization.

MN22-0007 intersected the unconformity at 671.8 metres and returned anomalous boron (dravite) and uranium mineralization at and above the unconformity. Dravite is a boron rich clay mineral, often found in association with uranium mineralization and is considered an important pathfinder in uranium exploration Notable intercepts include 1,060 ppm boron (B) from 669.3 – 669.8 metres (0.5 metres), 931 ppm B from 668.8 – 669.3 metres (0.5 metres), and 614 ppm B from 668.8 – 671.8 metres (2.5 metres) in conjunction with 41 ppm U3O8 from 671.8 – 672.3 metres (0.5 metres).

Significant polymetallic mineralization was intersected below the unconformity of hole MN22-007 including 884 ppm copper from 679.2 – 679.7 metres (0.5 metres) and 158 ppm zinc from 676.0 – 683.75 metres (17.75 metres).

Significant boron mineralization was also encountered in hole MN22-008 which intersected the unconformity at 649.02 metres and returned 386 ppm B from 646.02 – 648.52 metres (2.5 metres).

The Phase 2 program was comprised of 2,776 metres of diamond drilling over four holes. The first hole MN22-006 was wedged and re-started at 572 metres (MN22-006A), serving as a follow up hole to MN22-002 which was drilled during Phase 1 and hosted prospective uranium mineralization. The following two holes MN22-007 and MN22-008, targeted the southeastern portion of the tenure which had previously been untested. This southeastern zone was drilled to test a strong interpreted basement conductor that was situated on a magnetic low and on the border of a gravity low anomaly which is interpreted as a basement fault structure.

Basin Uranium owns the Wray Mesa project in southeastern Utah which has seen significant historic uranium and vanadium exploration and is located adjacent to the fully-permitted and production ready La Sal project. The company has an option to acquire a 75% interest in the Mann Lake uranium project from Skyharbour and holds an option in the CHG gold exploration project located approximately 15 km northwest of Clinton in south-central British Columbia.

tsxv
cse
otc
otcqx




tsxv-syh
skyharbour-resources-ltd
skyharbour resources ltd
cse-nclr
basin-uranium-corp
basin uranium corp

Share this article:

Uranium Exploration Company Announces Additional Staking in the Athabasca Basin

Source: Streetwise Reports 12/22/2023

Skyharbour Resources Ltd. announced an update from its Canada-based Falcon Project along with additional…

Share this article:

Published

on

By

Continue Reading
Energy & Critical Metals

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla Launches New Mega Factory Project In Shanghai, Designed To Manufacture 10,000 Megapacks Per Year

Tesla has launched a new mega factory…

Share this article:

Published

on

Continue Reading
Energy & Critical Metals

Giving thanks and taking stock after “a remarkable year”

An end-of-year thank you to our readers, industry colleagues and advertisers before Electric Autonomy breaks from publishing until Jan. 2
The post Giving…

Share this article:

Published

on

Continue Reading

Trending