Jaguar Mining Reports Third Quarter Operating Results

Operations Increase Production 12% Quarter over QuarterStrong Liquidity and Free Cash FlowTORONTO, ON / ACCESSWIRE / October 12, 2021 / Jaguar Mining Inc….

Share this article:

Published

on

Operations Increase Production 12% Quarter over Quarter

Strong Liquidity and Free Cash Flow

TORONTO, ON / ACCESSWIRE / October 12, 2021 / Jaguar Mining Inc. (“Jaguar” or the “Company”) (TSX:JAG)(OTCQX:JAGGF) today announces interim gold production results for the third quarter of 2021 (“Q3 2021”). Financial results for Q3 2021 will be reported and filed on SEDAR on or before November 15, 2021. All figures are in US Dollars, unless otherwise expressed.

Vern Baker, President and CEO of Jaguar Mining stated: “Production improved to achieve levels near last year´s final quarters. Pilar is on track to produce at plus 12,000 ounces per quarter on a regular basis. Turmalina´s production moved back over 10,000 ounces per quarter matching the best quarters of the last several years. Investment in exploration is beginning to pay off as two projects are moving into the resource definition phase, one is moving into pre-feasibility work, and grass roots efforts on our joint venture tenements have generated multiple targets. The company is well positioned to move ahead with the projects we see potentially adding to our resources and then into our production profile. Positive cash flow from both operations funded our full suite of exploration and growth activities. We foresee a similar quarter in Q4 with additional spend on our growth portfolio.”

Q3 2021 Operating Highlights

  • Consolidated gold production increased 12% quarter on quarter with 22,602 ounces produced compared to 20,212 ounces produced in Q2 2021. Production was lower compared to 24,094 ounces in Q3 2020. While tonnage performance was higher in Q3 2021, lower grades due to sequencing and stoping location resulted in less ounces produced than Q3 2020.
    • Pilar production improved to 12,337 ounces compared to 11,631 ounces produced in Q2 2021.
    • Turmalina production improved to 10,265 ounces compared to 8,581 ounces produced in Q2 2021.
  • Total definition, infill and exploration drilling was on plan at 18,693 metres, which was slightly higher than Q3 2020 at 18,055 metres drilled. Diamond Drilling remains on plan to provide growth in resources and reserves this year.
  • Total development of 2,615 metres for Q3 2021 was up from 2278 meters in Q2 2021 and consistent with Q3 2020 development of 2,701 metres.
  • As of September 30, 2021, the Company had cash of $38 million compared to cash of $34 million on June 30, 2021. During the quarter, the Company paid a dividend of $2.3 million.

The table below summarizes Q3 2021 operating results compared to Q3 2020:

CEO Vern Baker commented on the performance recovery from the first half of the year: “Issues created by the pandemic have moderated or have been mitigated as we demonstrated during the third quarter and expect to continue demonstrating in the fourth quarter. While the company continues utilizing our COVID-19 Action Plan, the operations have adapted to the restrictions, and absenteeism has reduced to manageable levels. As of the beginning of October 93% of the Jaguar workforce had been partially or fully vaccinated. With issues abating from the pandemic, we are very pleased that we were able to continue with our full commitment to Exploration. That commitment has now positioned our exploration and growth teams to work on projects that range from: 1) Project definition at Faina; 2) Inferred conversion to Measured and Indicated within the mines; 3) New resource delineation of new areas; 4) review for re-stating of resources within prior operating zones; and 5) Grass roots development of new targets. All of this work is focused on providing the resource base to fully utilize of our plant capacity.”

Risks and Mitigating Factors

Jaguar is maintaining its social licenses to operate in all sites throughout Brazil and continues to deliver on its ethical and collaborative partnerships with employees, suppliers, local communities and unions. During this COVID-19 pandemic, the Company has formulated a formal COVID-19 Action Plan which has been adopted company-wide. The Action Plan is committed to sustainability while implementing increased health and safety initiatives with all stakeholders, emphasizing the protection of employees and their employment.

COVID-19 remains the largest question mark for all companies. At any time, state and federal government mandates may change and any mandate that would result in the shutdown of operations will affect the Company’s production. As well, the pandemic may impact the availability of our workforce or supplies. Jaguar is not able to predict the consequences of the pandemic over the next several months and hence is unable to project the impact on production at the current time.

Qualified Persons

Scientific and technical information contained in this press release has been reviewed and approved by Jonathan Victor Hill, BSc (Hons) (Economic Geology – UCT), Senior Expert Advisor Geology and Exploration to the Jaguar Mining Management Committee, who is also an employee of Jaguar Mining Inc., and is a “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

The Iron Quadrangle

The Iron Quadrangle has been an area of mineral exploration dating back to the 16th century. The discovery in 1699-1701 of gold contaminated with iron and platinum-group metals in the southeastern corner of the Iron Quadrangle gave rise to the name of the town Ouro Preto (Black Gold). The Iron Quadrangle contains world-class multi-million-ounce gold deposits such as Morro Velho, Cuiabá, and São Bento.

About Jaguar Mining Inc.

Jaguar Mining Inc. is a Canadian-listed junior gold mining, development, and exploration company operating in Brazil with three gold mining complexes and a large land package with significant upside exploration potential from mineral claims covering an area of approximately 56,000 hectares within the Iron Quadrangle (32 kHa Jaguar, 24 kHa Iamgold Joint Venture). The Company’s principal operating assets are located in the Iron Quadrangle, a prolific greenstone belt in the state of Minas Gerais and include the Turmalina Gold Mine Complex and Caeté Mining Complex (Pilar and Roça Grande Mines, and Caeté Plant). The Company also owns the Paciência Gold Mine Complex, which has been on care and maintenance since 2012. The Roça Grande Mine has been on temporary care and maintenance since April 2019. Additional information is available on the Company’s website at www.jaguarmining.com.

For further information, please contact:

Vern Baker
Chief Executive Officer
[email protected]
416-847-1854

Hashim Ahmed
Chief Financial Officer
[email protected]
416-847-1854

Forward-Looking Statements and Cautionary Notes

Certain statements in this news release constitute “forward-looking information” within the meaning of applicable Canadian securities legislation. Forward-looking statements and information are provided for the purpose of providing information about management’s expectations and plans relating to the future. All of the forward-looking information made in this news release is qualified by the cautionary statements below and those made in our other filings with the securities regulators in Canada. Forward-looking information contained in forward-looking statements can be identified by the use of words such as “are expected,” “is forecast,” “is targeted,” “approximately,” “plans,” “anticipates,” “projects,” “anticipates,” “continue,” “estimate,” “believe” or variations of such words and phrases or statements that certain actions, events or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved. All statements, other than statements of historical fact, may be considered to be or include forward-looking information. This news release contains forward-looking information regarding, among other things, expected sales, production statistics, ore grades, tonnes milled, recovery rates, cash operating costs, definition/delineation drilling, the timing and amount of estimated future production, costs of production, capital expenditures, costs and timing of the development of projects and new deposits, success of exploration, development and mining activities, currency fluctuations, capital requirements, project studies, mine life extensions, restarting suspended or disrupted operations, continuous improvement initiatives, and resolution of pending litigation. The Company has made numerous assumptions with respect to forward-looking information contained herein, including, among other things, assumptions about the estimated timeline for the development of its mineral properties; the supply and demand for, and the level and volatility of the price of, gold; the accuracy of reserve and resource estimates and the assumptions on which the reserve and resource estimates are based; the receipt of necessary permits; market competition; ongoing relations with employees and impacted communities; political and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, the impact of any potential power rationing, tailings facility regulation, exploration and mine operating licenses and permits being obtained and renewed and/or there being adverse amendments to mining or other laws in Brazil and any changes to general business and economic conditions. Forward-looking information involves a number of known and unknown risks and uncertainties, including among others: the risk of Jaguar not meeting the forecast plans regarding its operations and financial performance; uncertainties with respect to the price of gold, labour disruptions, mechanical failures, increase in costs, environmental compliance and change in environmental legislation and regulation, weather delays and increased costs or production delays due to natural disasters, power disruptions, procurement and delivery of parts and supplies to the operations; uncertainties inherent to capital markets in general (including the sometimes volatile valuation of securities and an uncertain ability to raise new capital) and other risks inherent to the gold exploration, development and production industry, which, if incorrect, may cause actual results to differ materially from those anticipated by the Company and described herein. In addition, there are risks and hazards associated with the business of gold exploration, development, mining and production, including environmental hazards, tailings dam failures, industrial accidents and workplace safety problems, unusual or unexpected geological formations, pressures, cave-ins, flooding, chemical spills, procurement fraud and gold bullion thefts and losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Accordingly, readers should not place undue reliance on forward-looking information.

For additional information with respect to these and other factors and assumptions underlying the forward-looking information made in this news release, see the Company’s most recent Annual Information Form and Management’s Discussion and Analysis, as well as other public disclosure documents that can be accessed under the issuer profile of “Jaguar Mining Inc.” on SEDAR at www.sedar.com. The forward-looking information set forth herein reflects the Company’s reasonable expectations as at the date of this news release and is subject to change after such date. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law. The forward-looking information contained in this news release is expressly qualified by this cautionary statement.

SOURCE: Jaguar Mining Inc.

View source version on accesswire.com:
https://www.accesswire.com/667641/Jaguar-Mining-Reports-Third-Quarter-Operating-Results





Share this article:

Today’s News

Freeman Gold Announces Phase 2 Lemhi Resource Expansion and Beauty Zone Drill Program

Freeman Gold Announces Phase 2 Lemhi Resource Expansion and Beauty Zone Drill Program
Canada NewsWire
VANCOUVER, BC, Oct. 27, 2021

Phase 2 – >4,000 m diamond drill program
>3,200 metres testing strike extensions, primarily to the east and we…

Share this article:

Freeman Gold Announces Phase 2 Lemhi Resource Expansion and Beauty Zone Drill Program

Canada NewsWire

Phase 2 – >4,000 m diamond drill program

  • >3,200 metres testing strike extensions, primarily to the east and west of the current resource
  • 400 metre drill hole to test depth extent of gold mineralization at Lemhi
  • 400 metres of exploration drill holes at the Beauty Zone

CANADIAN SECURITIES EXCHANGE: FMAN

VANCOUVER, BC, Oct. 27, 2021 /CNW/ – Freeman Gold Corp. (CSE: FMAN) (OTCQB: FMANF) (FSE: 3WU) (“Freeman” or the “Company“) is pleased to announce its Phase 2 diamond drill program at the Lemhi Gold Deposit (“Lemhi“) and the new Beauty Zone (“Beauty Zone“). The proposed >4,000 m drill program focuses on adding near surface, oxide ounces to the recently reported maiden Mineral Resource Estimate on July 8, 2021. Drilling will also test the recently delineated Beauty Zone which lies approximately 600 metres west of Lemhi and host to a number of high-grade gold rock samples and coincident gold soil geochemistry.

“We are embarking on a second phase of diamond drilling focusing on ground (patented mining claims) that gives Freeman the highest probability of adding ounces to our resource base. The on-strike east and west extensions at Lemhi are key as these would provide new ounces within our current conceptual pit outline. As well, the Lemhi deposit has never been tested at depth beyond 286 metres where a number of holes were terminated in gold mineralization. Freeman plans to test mineralization at depth with at least one >400 m drill hole. We are also excited about testing the newly identified high grade Beauty Zone which returned 52 rock samples over 1 gram per tonne (“g/t”) gold (“Au“) and 28 over 10 g/t Au with coincident anomalous gold soil geochemistry,” remarked Paul Matysek, Executive Chairman.

Over 90% of the total drilling is anticipated to occur at Lemhi, while the remaining drilling will test the Beauty Zone. Of the 3,600 metres to be drilled at Lemhi, 3,025 metres are focused on resource expansion on strike down to a maximum depth of 300 metres below surface. These holes will follow up on drill holes from previous campaigns that remain open, such as FG20-24C which returned 0.4 g/t Au over 72 metres on section 429825N. One drill hole will test the depth potential at Lemhi down to 400 metres below surface; the hole will also infill in the shallower portions between drill holes FG20-17C (151m @ 2.5 g/t Au) and 35C (189m @ 0.54 g/t Au). A single infill hole is planned on section 429952N where a gap in the mineralization is present.

Figure 1 shows the proposed drilling plan map. Table 1 provides details on a hole-by-hole basis. Sections referred to on the Table can be viewed at www.freemangoldcorp.com.

Figure 1: 2021 Proposed Drilling Plan Map (CNW Group/[nxtlink id=

Table 1.  Fall 2021 Drilling – Lemhi Project

Hole ID

Project

Azimuth

Dip

Proposed
Depth
(m)

Hole Type

Comment

FG21-001

Beauty

0

-90

100

Exploration

Drill test Beauty Zone

FG21-002

Beauty

230

-65

100

Exploration

Drill test Beauty Zone

FG21-003

Beauty

0

-90

200

Exploration

Drill test Beauty Zone

FG21-004

Lemhi

0

-90

400

Resource
Expansion & Infill

Test Mineralization at depth.  Section 430000N. Infill between
FG20-17C (151m @ 2.5 g/t Au)  and 35C (189m @ 0.54 g/t
Au). 

FG21-005

Lemhi

270

-68

250

Resource
Expansion

90m stepout to the West.  Section 429625N

FG21-006

Lemhi

270

-70

250

Resource
Expansion

Step out to the southwest.  Section 429700N.

FG21-007

Lemhi

0

-90

250

Resource
Expansion

Step out to the southwest.  Section 429775N.

FG21-008

Lemhi

0

-90

250

Resource
Expansion

90m step out to the Southwest.  Follow up FG20-24C (72m @
0.4 g/t Au) and 1980’s drilling.  Section 429825N.

FG21-009

Lemhi

0

-90

300

Resource
Expansion

Step out to the East.  Section 429800N

FG21-010

Lemhi

0

-90

300

Resource
Expansion

Step out to the East.  Section 429850N

FG21-011

Lemhi

0

-90

300

Resource
Expansion

90m stepout to the West.  Section 429900N

FG21-012

Lemhi

0

-90

300

Resource
Expansion

40m stepout to the West of 1980’s drilling.  Section 429950N

FG21-013

Lemhi

0

-90

250

Infill

Infill gap in drilling in resource area.  Section 429950N.

FG21-014

Lemhi

0

-90

225

Resource
Expansion

Stepout 40 m to the North-East.  Section 429975N

FG21-015

Lemhi

0

-90

300

Resource
Expansion

90m stepout to the West.  Section 429975N

FG21-016

Lemhi

0

-90

300

Resource
Expansion

85m stepout to the West.  Section 430000N

All drill rock samples are sent to ALS Minerals Division, Vancouver, BC, an independent and fully accredited laboratory in Canada for analysis for gold by Fire Assay and multi-element Induction Coupled Plasma Spectroscopy. Freeman has a regimented Quality Assurance, Quality Control program where at least 10% duplicates, blanks and standards are inserted into each sample shipment. Rock grab samples are by their nature selective and are not necessarily indicative of the general geology or the grade within the Lemhi Gold property.

About the Company

Freeman Gold Corp. is a mineral exploration company focused on the development of its 100% owned Lemhi Gold property (the “Lemhi Project“). The Lemhi Project comprises 30 square kilometers of highly prospective land. The project hosts a near surface, shallow, high grade oxide gold resource. The pit constrained National Instrument 43-101 (“NI 43-101“) compliant mineral resource estimate is comprised of 749,800 ounces (“oz”) gold at 1.02 grams per tonne in 22.94 million tonnes (Indicated) and 250,300 oz Au at 1.01 g/t Au in 7.83 million tonnes (Inferred). See the NI 43-101 technical report  titled “Maiden Resource Technical Report for the Lemhi Gold Project, Lemhi County, Idaho, USA” with an effective date of June 1, 2021, and signing date of July 30, 2021, as prepared by APEX Geoscience Ltd. and F. Wright Consulting Inc. available under the Company’s profile on SEDAR (www.sedar.com). The Company is focused on growing and advancing the Lemhi Project towards a production decision. The technical content of this news release has been reviewed and approved by Dean Besserer, P.Geol., VP Exploration of the Company and a Qualified Person as defined by NI 43-101.

On Behalf of the Company
William Randall
President & CEO

Forward Looking Statements: This press release contains “forward–looking information or statements” within the meaning of Canadian securities laws, which may include, but are not limited to statements relating to its future business plans. All statements in this release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words “expects,” “plans”, “anticipates”, “believes”, “intends”, “estimates”, “projects”, “potential” and similar expressions, or that events or conditions “will”, “would”, “may”, “could” or “should” occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ from those in the forward-looking statements. Such forward-looking information reflects the Company’s views with respect to future events and is subject to risks, uncertainties, and assumptions. The Company does not undertake to update forward–looking statements or forward–looking information, except as required by law.

Neither Canadian Securities Exchange nor its regulation services provider accepts responsibility for the adequacy or accuracy of this release.

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/freeman-gold-announces-phase-2-lemhi-resource-expansion-and-beauty-zone-drill-program-301409893.html

SOURCE Freeman Gold Corp.








Author: Author

Share this article:

Continue Reading

Today’s News

Quaterra Resources Awards Contract for the Further Advancement of Its MacArthur Oxide Copper Project in Yerington, Nevada

Vancouver, British Columbia–(Newsfile Corp. – October 27, 2021) – Quaterra Resources Inc. (the "Company") (TSXV: QTA) (OTCQB: QTRRF) is pleased to announce…

Share this article:

Vancouver, British Columbia–(Newsfile Corp. – October 27, 2021) – Quaterra Resources Inc. (the “Company“) (TSXV: QTA) (OTCQB: QTRRF) is pleased to announce that it has awarded McClelland Laboratories, Inc. (“McClelland“) a key contract to support the advancement of the MacArthur oxide copper project.

McClelland has been appointed to complete the metallurgical testing program of the 12 ton (11 tonne) representative sample collected in the 2021 drilling campaign (see news release dated October 6, 2021, “Quaterra Resources Announces Positive Assay Results at MacArthur Copper Project, Nevada and Potential for Resource Expansion“). McClelland will perform variability testing on fifteen leach columns through Q2 2022 in order to further validate the metallurgical parameters to be utilized in the MacArthur Pre-Feasibility Study (“PFS“).

McClelland, based in Sparks, Nevada, maintains a 44,000 square-foot facility and has been a leader in servicing the mining industry for over 33 years.

Quaterra CEO Travis Naugle states, “We are very pleased to have engaged with a leading Nevada-based contractor to advance a key aspect of the MacArthur PFS so soon after the recently announced oversubscribed private placement. We look forward to continuing with further important steps on the MacArthur oxide copper project.”

About Quaterra Resources Inc.
Quaterra Resources Inc. is a copper-gold development and exploration company focused on projects with the potential to host large-scale mineral deposits attractive to major mining companies. It is advancing its MacArthur oxide copper project in the historic Yerington Copper District, Nevada. It continues to investigate opportunities to acquire prospects in North America on reasonable terms and the partnerships with which to advance them.

On behalf of the Board of Directors,
Stephen Goodman
President

For more information please contact:
Karen Robertson
Corporate Communications
778-898-0057
Email: [email protected]
Website: www.quaterra.com

This news release does not constitute an offer to sell or a solicitation of an offer to sell any of the securities in the United States. The securities referred to herein have not been and will not be registered under the United States Securities Act of 1933, as amended or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

Technical information contained in this news release has been reviewed and approved by Travis Naugle, MMSA QP, the Company’s CEO and a director, and a qualified person as defined in National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/100981






Author: Author

Share this article:

Continue Reading

Today’s News

Phoenix Gold Begins Phase 2 Drilling at York Harbour Cu-Zn-Ag-Co Project in Newfoundland

 

Vancouver, British Columbia – TheNewswire – October 27, 2021 – Phoenix Gold Resources Corp. (TSXV:PXA) (OTC:PGRCF) (Frankfurt:5DE) (“Phoenix…

Share this article:

Vancouver, British Columbia – TheNewswire – October 27, 2021 – Phoenix Gold Resources Corp. (TSXV:PXA) (OTC:PGRCF) (Frankfurt:5DE) (“Phoenix Gold” or the “Company”) is pleased to report that Phase 2 diamond drilling has begun on its York Harbour Mine Property (“York Harbour” or the “Property”) in western Newfoundland, Canada. Three drill holes have been completed during the past 10 days of a planned 27-hole diamond drilling program totalling an estimated 4,225 metres.

The on-site project geologist has reported that the latest drill hole YH21-14 intersected semi-massive and massive volcanogenic sulphide (‘VMS’) mineralization from a drilling length of 105 to 120 m.  After geological and geotechnical logging the drill core from holes YH21-13 and -14 will be transported to the Planet X Exploration facilities in Gander for sampling and later shipping to Actlabs in Ancaster, Ontario for rush ICP analyses and over-limit assaying.

Photographs of the drill core with the reported massive sulphide mineralization intersected by drill holes YH21-13 and 14 are shown as follows.


Click Image To View Full Size

 

       Massive sulphide in DDH YH21-13              Massive sulphide in DDH YH21-14

 

The Phase 1 drilling program was carried out from July 28th to August 14th.  This program, the first on the property since Wolfden Resources’ drilling in 2004, successfully validated historical drilling results with 6 of the 9 drill holes intersecting drill-indicated Cyprus-type VMS mineralization in the historical ‘A’, ‘G’ and ‘H’ zones and encountering similar mineralization both along strike and downdip of these zones.  Two diamond drill holes had to be abandoned when they encountered a wide fault zone, and a third hole intersected a section of the 400 Level adit where it lost circulation and was not completed to its intended depth.

At the present time the Company is awaiting the analytical results for 200 of 300 drill core samples from the Phase 1 diamond drilling program.  Selected mineralized intercepts from 4 of the 9 Phase 1 drill holes were reported in the Company’s news release dated October 12th.  A few of those mineralized intercepts that were previously reported for drill holes YH21-04, -06, -08 and –09 are as follows.

DDH

From

To

Interval

Copper

Zinc

Silver

Target Zone

No.

(m)

(m)

(m)

(%)

(%)

(gpt)

 

YH21-04

180.03

189.54

9.51

1.69

0.13

1.43

H Zone

YH21-06

146.26

194.05

47.79

0.85

0.57

1.49

H Zone

YH21-08

122.30

128.90

6.60

0.62

0.65

3.37

G Zone

YH21-09

5.00

14.54

9.54

1.69

0.11

2.83

A Zone

 

The Phase 2 diamond drilling program has been designed to firstly better delineate the known drill-indicated VMS mineralization for future resource estimations and to explore for additional similar mineralization both along strike and downdip.  Historical underground drill holes report a number of massive and semi-massive mineralized intercepts between and along strike of the known zones but without reported assays.  At two of these historical intercepts the latest drill holes YH21-13 and 14 have confirmed significant VMS mineralization.  Thus, the Phase 2 program will include both delineation and exploration drilling.

In addition to the Phase 2 drilling program exploration work on the property has also included re-locating the No. 4 Brook adit and massive sulphide showing situated approximately 1 km from the current drilling on the eastern limb of the folded volcanic sequence which hosts known VMS mineralization.  On October 16th several field personnel visited the site and reported approximately 15 m of massive and semi-massive sulphide mineralization, including pyrite, chalcopyrite and sphalerite, in a sheared zone near the sloughed-in adit.  This showing is currently accessible via a cut trail but will require upgrading for ATV and drill rig access.  A field crew is currently cutting channel samples across the visible mineralization with shipping and analysis to follow.  This showing is scheduled to be drill tested in early 2022.

Consulting mining engineers of Gemtec, based in St Johns, have been commissioned to apply for permitting approval to enter the 400 Level adit, and in the meantime the Company is investigating the use of a lidar drone to survey the adit this year.

The following figures show the proposed locations of the Phase 2 diamond drilling on the York Harbour property.  The red coloured and hatched bodies in Figures 2 and 3 are the two-dimensional, surface-projected images of the drill-indicated VMS mineralization.  The purple hatched body is the surface projection of the 400 Level adit.


Click Image To View Full Size

 

Figure 1: Plan View of Proposed Phase 2 Diamond Drilling Program, York Harbour Property

 


Click Image To View Full Size

 

Figure 2: Plan View of North Section of Proposed Phase 2 Diamond Drilling Program


Click Image To View Full Size

 

Figure 3: Plan View of South Section of Proposed Phase 2 Diamond Drilling Program

 

About the York Harbour Mine Property

 

The York Harbour Mine Property is located approximately 27 kilometres west of Corner Brook, NL and known to be prospective for its copper-zinc-silver-gold-cobalt massive sulphide deposits. The known mineralization exhibits characteristics consistent with classic mafic-type flow dominated (Cyprus-type) VMS deposits. Similar geological environments and styles of mineralization have formed relatively large copper-zinc deposits elsewhere in Newfoundland at Tilt Cove (9 Mt of between 1% and 12% copper) and in Cyprus at the Mavrovouni mine (15 Mt of 4% copper with zinc and gold); as noted in Messina Minerals Inc. 9th Year Assessment Report (2009).

 

Copper and zinc massive sulphides were first discovered at York Harbour in 1893. Since then a total of 2,134 metres of documented underground drifting and development have been completed for which documentation is available.  Drill core logs and sampling data is available for a total of 19,323 metres of historical drilling that tested eleven lenses or zones of copper-zinc-silver-gold-cobalt massive sulphide mineralization. These zones occur over a 600-metre strike length and many remain open for expansion both along strike and downdip.

 

Most historical exploration and underground development have been concentrated within a 350- metre long segment of a stratigraphic contact between lower and upper basaltic units, and within 150 metres of surface. An overturned synclinal fold is interpreted to extend and repeat the favourable mineralized horizon along the western portion of the property where surface prospects at the No. 4 Brook showing of copper- and zinc-bearing massive sulphides have been discovered and documented in outcrop but have received very little modern exploration attention.

 

J.D. Blanchflower, P. Geo. is a qualified person in accordance with National Instrument 43-101 who has reviewed and accepted the technical material contained in this news release.

 

For further information:

 

Andrew Lee CEO, President and Director

Telephone: 778-302-2257 | Email: [email protected]

Website: www.phoenixgoldresources.ca

 

Cautionary Statement Regarding Forward-Looking Information

 

This news release may contain “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities legislation. All information contained herein that is not historical in nature may constitute forward-looking information. Forward-looking statements herein include but are not limited to statements relating to satisfactory completion of due diligence and any acquisition under the Option and are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market and economic risks, uncertainties and contingencies that may cause actual results, performance or achievements to be materially different from those expressed or implied by forward-looking statements. Except as required by law, the Company disclaims any obligation to update or revise any forward-looking statements. Readers are cautioned not to put undue reliance on these forward-looking statements.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

 

Copyright (c) 2021 TheNewswire – All rights reserved.

Author: Author

Share this article:

Continue Reading

Trending