Connect with us

Today’s News

Eagle Plains Announces Drill Results From 100% Owned Donna Project, South-Central British Columbia

CRANBROOK, BC / ACCESSWIRE / October 5, 2021 / Eagle Plains Resources Ltd. (TSXV:EPL) ("Eagle Plains") has received analytical results from the 12-hole,…

Share this article:

Published

on

CRANBROOK, BC / ACCESSWIRE / October 5, 2021 / Eagle Plains Resources Ltd. (TSXV:EPL) (“Eagle Plains”) has received analytical results from the 12-hole, 1152m (3,779′) drill program completed in June/July on EPL’s 100%-owned Donna property located 15km east of Cherryville, BC (the “Property”). The 2021 program was a continuation of work which was suspended in early October, 2020 due to early onset of winter conditions, and tested for gold and silver mineralization associated with a prominent gold-in-soil geochemical anomaly delineated at the Gossan Zone and the first-ever drilling in the area of the historical Morgan Mine workings.

The 11,329 ha Property is road-accessible and is transected by a high-voltage powerline. The claims overlie rocks of the prolific Quesnellia Terrane, host to many major B.C. porphyry deposits such as Highland Valley, Gibraltar, Mount Polley, Mount Milligan, Copper Mountain and others. Despite the rich endowment of mineralization in these rocks, the Donna area has seen relatively little exploration activity by industry or government. Placer gold claims overlie many of the creeks draining the Donna Property. Management cautions that past results or discoveries on proximate land are not necessarily indicative of the results that may be achieved on the Donna property

See Donna Regional Projects Map here

2021 Drill Results

Eagle Plains completed 12 holes for 1152m (3,779′) of diamond drilling with two holes at the Gossan Zone and 10 holes at the Morgan Zone. Exploration activity was carried out by TerraLogic Exploration Services Inc. of Cranbrook, BC.

Analytical results ranged from trace values to higher-grade intercepts, as summarized below.

Select Drill Results Table:

DO19001 – DO21012 Significant Intervals

Hole

From

To

Core Length (m)*

Au (g/t)

Zone

DO19001

134.00

135.50

1.50

9.41

Gossan

DO21002

158.0

159.48

1.48

0.54

 

159.99

160.70

0.71

0.50

 

169.0

169.77

0.77

4.46

 

178.0

179.0

1.0

0.37

 

185.86

186.50

0.64

0.39

 

193.0

195.0

2.0

1.33

           

DO21011

56.34

56.84

0.50

0.10

Morgan

DO21012

8.40

9.0

0.60

0.17

 

15.80

16.61

0.81

0.11

 

51.17

51.70

0.53

0.33

* All drill indicated intercepts as reported in this news release are measured along core length and true thickness is yet to be determined.

See Donna Regional Projects Map here

Drill holes DO19-001 and DO21-002 tested a large soil geochemical anomaly at the Gossan Zone which was defined by past programs carried out by Eagle Plains. DO19-001 was the deepening of a 2019 drillhole and returned 9.4 g/t Au over 1.5m from sheared quartz-calcite veins along the contact between an upper limestone unit and a diorite intrusive. The purpose of the hole was to intersect the lower contact of the diorite-porphyry intrusion. The hole ended in a metavolcanic unit and did not intersect the limestone.

DO21-002 was drilled from the same Pad as D09-001, and targeted the hangingwall and footwall contacts of the diorite stock, with surface soil geochemical results of up to 5.3 g/t Au. The best result of 4.46 g/t Au over 0.77m came from a zone of quartz veining stockwork with minor pyrite hosted in diorite.

Drillholes DO21003 – DO21012 were the first drill holes completed at the historic past producing Morgan Mine area. All of the holes intersected a mix of limestone and metavolcanics cut by diorite dykes and local quartz-calcite shears and veins with calc-silicate and lesser chlorite alteration.

2021 Field Program Results

Surface work on the Donna Property in 2021 followed up on targets generated by an extensive data compilation and reinterpretation which incorporated both historic geological and geophysical results and new 2020-2021 airborne radiometric and magnetic survey data. Field assessment of selected target zones included soil and silt-stream geochemical surveys, geophysical guided prospecting, and known historical property viewings. A total of 1219 soil sample, 84 silt sample and 92 rock sample assay results were collected from the Gossan, Morgan, St. Paul, Yeoward, Donna, Irene, and Railroad zones. Highlight sample results include: 510 ppb Au (soil), 930 ppb Au (silt), and 21.1 g/t Au (rock grab). Results from the surface program, in tandem with the data compilation and recent geophysical data results, will be used to prioritize additional field work and follow-up drill targets for subsequent exploration programs.

Precision GeoSurveys Inc. of Langley, BC recently completed a helicopter-borne combined high resolution airborne magnetic, VLF-EM and radiometric geophysical survey at the Donna. A total of 678 line-km of surveying were completed in two separate grids. The results will be released after final compilation and interpretation is completed.

Donna Project Summary

See Donna Project Summary Map here

The core claims of the Donna property were acquired in 2016 by Eagle Plains with additional tenures subsequently added through staking. Certain claims comprising the property are subject to an underlying 2% royalty held by an arms-length third party. The project area is located in the Monashee Mountains within the source headwaters of the historic Kettle River and Yeoward Creek placer gold camps. The claims lie within one of the largest clusters of anomalous values in gold and typical associated pathfinder elements identified in the British Columbia Regional Geochemical Surveys stream-sediment program carried out in the joint Federal – Provincial programs from 1985-1990.

The Donna property is underlain by a sequence of marine sediments comprising carbonaceous black argillite, limestone, and volcanic rocks of Permian to Lower Triassic age. Locally these rocks were intruded by stocks and plugs of mafic-intermediate composition. The project area is considered to hold good potential to host intrusive-related gold mineralization.

Since acquiring the property, Eagle Plains has carried out annual systematic exploration including a 470 line-km geophysical survey in 2017 which followed a comprehensive compilation of all historical work. The property boasts a robust GIS database consisting of rock, soil, silt, till, trench and drill-hole results within and adjacent the property area. In July, 2020, EPL completed the purchase of historical crown grants covering workings documented at the St. Paul and Morgan mines (BCMINFILE 082LSE010), which include shafts, tunnels, winzes and an unknown number of open cuts and trenches, as well as a tramline and stamp mill that operated in the early 1900’s. Recorded production from the St. Paul and Morgan deposits for the period 1914-1961 total 392 tonnes containing 5,630 grams of gold, 112,406 grams of silver, 3,720 kilograms of lead and 1,258 kilograms of zinc. Various geological reports and government publications report underground sampling returning values ranging from trace quantities to highs of up to 93.9 g/t (2.74 oz/t) gold and 60.3 g/t (1.76 oz/t) silver over a 0.6m sample width. All historical mine workings are currently inaccessible. The previous results were taken directly from the BCMINFILE descriptions and assessment reports filed with the BCEMPR. Management cautions that historical results were collected and reported by past operators and have not been verified nor confirmed by a Qualified Person, but form a basis for ongoing work at the Donna property.

QA/QC

Geological and geotechnical logging and core sampling were completed on the property in a temporary core facility near the past producing Morgan Mine. Assay intervals were based on visual identification of mineralization, presence and density of quartz veins and lithological boundaries. Terralogic Exploration geologists maintained chain of custody and sampling procedures reported in this news release according to best industry practice and with due attention to quality assurance and quality control, including sampling field duplicates and insertion of certified standard and blank samples.

Samples were sent for geochemical analysis with ALS Global, Vancouver for the following analyses: 48 element four-acid ICP-MS (ME-MS61) and gold (Au) 30 g Fire Assay – AA finish (Au-AA23). Samples that returned over 1ppm Au by Au-AA23 were re-analysed using gold (Au) 30g Fire Assay – Gravimetric finish (Au-GRA21).

On receipt of final certificates of analysis, the QA/QC sample results were reviewed to ensure the order of samples were reported correctly, that the blanks ran clean, and that the results for each standard had minimal variance from its certified value. QA/QC for the Donna Drilling Program included certified reference material (“CRM’s”) and blanks that were inserted into each sample batch in order to verify the analytical from the lab. The CRM’s from all holes reported passed within 3 standard deviations and the blanks returned acceptable values. All of the lab internal standards and duplicates were within acceptable values.

Qualified Persons

The drilling and field program at the Donna was supervised by Jarrod Brown, P.Geo. of TerraLogic. Charles C. Downie, P.Geo., a “qualified person” for the purposes of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, and a Director of Eagle Plains Resources Ltd., has prepared, reviewed, and approved the scientific and technical disclosure in this news release.

Update on Kalum Drill Program

Work has been suspended on EPL’s Kalum project, currently under option to Rex Resources (see EPL news release July 15, 2021). Work was halted due to equipment failures and the inability to source new equipment, parts and personnel at this time. None of the planned holes were completed to target depths and no samples were sent for analysis. Rex holds the exclusive right to earn a 60-per-cent interest in the property by completing exploration expenditures of $3-million, making cash payments of $500,000 and issuing one million common shares to Eagle Plains over a four-year period. The partners have recently agreed to extend the next cash and share payment deadline from December 31st, 2021 to March 31st, 2022.

About Eagle Plains Resources

Based in Cranbrook, B.C., Eagle Plains continues to conduct research, acquire and explore mineral projects throughout western Canada. The Company is committed to steadily enhancing shareholder value by advancing our diverse portfolio of projects toward discovery through collaborative partnerships and development of a highly experienced technical team. Eagle Plains also holds significant royalty interests in western Canadian projects covering a broad spectrum of commodities. Management’s focus is to advance its most promising exploration projects. In addition, Eagle Plains continues to seek out and secure high-quality, unencumbered projects through research, staking and strategic acquisitions. Throughout the exploration process, our mission is to help maintain prosperous communities by exploring for and discovering resource opportunities while building lasting relationships through honest and respectful business practices.

Expenditures from 2011-2020 on Eagle Plains-related projects exceed $22M, most of which was funded by third-party partners. This exploration work resulted in approximately 37,000 m of diamond-drilling and extensive ground-based exploration work facilitating the advancement of numerous projects at various stages of development.

On behalf of the Board of Directors

“Tim J. Termuende”
President and CEO

For further information on EPL, please contact Mike Labach at 1 866 HUNT ORE (486 8673)
Email: [email protected] or visit our website at http://www.eagleplains.com

Cautionary Note Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results.

SOURCE: Eagle Plains Resources Ltd.

View source version on accesswire.com:
https://www.accesswire.com/666496/Eagle-Plains-Announces-Drill-Results-From-100-Owned-Donna-Project-South-Central-British-Columbia







Share this article:

Today’s News

Quaterra Resources Awards Contract for the Further Advancement of Its MacArthur Oxide Copper Project in Yerington, Nevada

Vancouver, British Columbia–(Newsfile Corp. – October 27, 2021) – Quaterra Resources Inc. (the "Company") (TSXV: QTA) (OTCQB: QTRRF) is pleased to announce…

Share this article:

Vancouver, British Columbia–(Newsfile Corp. – October 27, 2021) – Quaterra Resources Inc. (the “Company“) (TSXV: QTA) (OTCQB: QTRRF) is pleased to announce that it has awarded McClelland Laboratories, Inc. (“McClelland“) a key contract to support the advancement of the MacArthur oxide copper project.

McClelland has been appointed to complete the metallurgical testing program of the 12 ton (11 tonne) representative sample collected in the 2021 drilling campaign (see news release dated October 6, 2021, “Quaterra Resources Announces Positive Assay Results at MacArthur Copper Project, Nevada and Potential for Resource Expansion“). McClelland will perform variability testing on fifteen leach columns through Q2 2022 in order to further validate the metallurgical parameters to be utilized in the MacArthur Pre-Feasibility Study (“PFS“).

McClelland, based in Sparks, Nevada, maintains a 44,000 square-foot facility and has been a leader in servicing the mining industry for over 33 years.

Quaterra CEO Travis Naugle states, “We are very pleased to have engaged with a leading Nevada-based contractor to advance a key aspect of the MacArthur PFS so soon after the recently announced oversubscribed private placement. We look forward to continuing with further important steps on the MacArthur oxide copper project.”

About Quaterra Resources Inc.
Quaterra Resources Inc. is a copper-gold development and exploration company focused on projects with the potential to host large-scale mineral deposits attractive to major mining companies. It is advancing its MacArthur oxide copper project in the historic Yerington Copper District, Nevada. It continues to investigate opportunities to acquire prospects in North America on reasonable terms and the partnerships with which to advance them.

On behalf of the Board of Directors,
Stephen Goodman
President

For more information please contact:
Karen Robertson
Corporate Communications
778-898-0057
Email: [email protected]
Website: www.quaterra.com

This news release does not constitute an offer to sell or a solicitation of an offer to sell any of the securities in the United States. The securities referred to herein have not been and will not be registered under the United States Securities Act of 1933, as amended or any state securities laws and may not be offered or sold within the United States or to U.S. Persons unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

Technical information contained in this news release has been reviewed and approved by Travis Naugle, MMSA QP, the Company’s CEO and a director, and a qualified person as defined in National Instrument 43-101.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/100981






Author: Author

Share this article:

Continue Reading

Today’s News

Phoenix Gold Begins Phase 2 Drilling at York Harbour Cu-Zn-Ag-Co Project in Newfoundland

 

Vancouver, British Columbia – TheNewswire – October 27, 2021 – Phoenix Gold Resources Corp. (TSXV:PXA) (OTC:PGRCF) (Frankfurt:5DE) (“Phoenix…

Share this article:

Vancouver, British Columbia – TheNewswire – October 27, 2021 – Phoenix Gold Resources Corp. (TSXV:PXA) (OTC:PGRCF) (Frankfurt:5DE) (“Phoenix Gold” or the “Company”) is pleased to report that Phase 2 diamond drilling has begun on its York Harbour Mine Property (“York Harbour” or the “Property”) in western Newfoundland, Canada. Three drill holes have been completed during the past 10 days of a planned 27-hole diamond drilling program totalling an estimated 4,225 metres.

The on-site project geologist has reported that the latest drill hole YH21-14 intersected semi-massive and massive volcanogenic sulphide (‘VMS’) mineralization from a drilling length of 105 to 120 m.  After geological and geotechnical logging the drill core from holes YH21-13 and -14 will be transported to the Planet X Exploration facilities in Gander for sampling and later shipping to Actlabs in Ancaster, Ontario for rush ICP analyses and over-limit assaying.

Photographs of the drill core with the reported massive sulphide mineralization intersected by drill holes YH21-13 and 14 are shown as follows.


Click Image To View Full Size

 

       Massive sulphide in DDH YH21-13              Massive sulphide in DDH YH21-14

 

The Phase 1 drilling program was carried out from July 28th to August 14th.  This program, the first on the property since Wolfden Resources’ drilling in 2004, successfully validated historical drilling results with 6 of the 9 drill holes intersecting drill-indicated Cyprus-type VMS mineralization in the historical ‘A’, ‘G’ and ‘H’ zones and encountering similar mineralization both along strike and downdip of these zones.  Two diamond drill holes had to be abandoned when they encountered a wide fault zone, and a third hole intersected a section of the 400 Level adit where it lost circulation and was not completed to its intended depth.

At the present time the Company is awaiting the analytical results for 200 of 300 drill core samples from the Phase 1 diamond drilling program.  Selected mineralized intercepts from 4 of the 9 Phase 1 drill holes were reported in the Company’s news release dated October 12th.  A few of those mineralized intercepts that were previously reported for drill holes YH21-04, -06, -08 and –09 are as follows.

DDH

From

To

Interval

Copper

Zinc

Silver

Target Zone

No.

(m)

(m)

(m)

(%)

(%)

(gpt)

 

YH21-04

180.03

189.54

9.51

1.69

0.13

1.43

H Zone

YH21-06

146.26

194.05

47.79

0.85

0.57

1.49

H Zone

YH21-08

122.30

128.90

6.60

0.62

0.65

3.37

G Zone

YH21-09

5.00

14.54

9.54

1.69

0.11

2.83

A Zone

 

The Phase 2 diamond drilling program has been designed to firstly better delineate the known drill-indicated VMS mineralization for future resource estimations and to explore for additional similar mineralization both along strike and downdip.  Historical underground drill holes report a number of massive and semi-massive mineralized intercepts between and along strike of the known zones but without reported assays.  At two of these historical intercepts the latest drill holes YH21-13 and 14 have confirmed significant VMS mineralization.  Thus, the Phase 2 program will include both delineation and exploration drilling.

In addition to the Phase 2 drilling program exploration work on the property has also included re-locating the No. 4 Brook adit and massive sulphide showing situated approximately 1 km from the current drilling on the eastern limb of the folded volcanic sequence which hosts known VMS mineralization.  On October 16th several field personnel visited the site and reported approximately 15 m of massive and semi-massive sulphide mineralization, including pyrite, chalcopyrite and sphalerite, in a sheared zone near the sloughed-in adit.  This showing is currently accessible via a cut trail but will require upgrading for ATV and drill rig access.  A field crew is currently cutting channel samples across the visible mineralization with shipping and analysis to follow.  This showing is scheduled to be drill tested in early 2022.

Consulting mining engineers of Gemtec, based in St Johns, have been commissioned to apply for permitting approval to enter the 400 Level adit, and in the meantime the Company is investigating the use of a lidar drone to survey the adit this year.

The following figures show the proposed locations of the Phase 2 diamond drilling on the York Harbour property.  The red coloured and hatched bodies in Figures 2 and 3 are the two-dimensional, surface-projected images of the drill-indicated VMS mineralization.  The purple hatched body is the surface projection of the 400 Level adit.


Click Image To View Full Size

 

Figure 1: Plan View of Proposed Phase 2 Diamond Drilling Program, York Harbour Property

 


Click Image To View Full Size

 

Figure 2: Plan View of North Section of Proposed Phase 2 Diamond Drilling Program


Click Image To View Full Size

 

Figure 3: Plan View of South Section of Proposed Phase 2 Diamond Drilling Program

 

About the York Harbour Mine Property

 

The York Harbour Mine Property is located approximately 27 kilometres west of Corner Brook, NL and known to be prospective for its copper-zinc-silver-gold-cobalt massive sulphide deposits. The known mineralization exhibits characteristics consistent with classic mafic-type flow dominated (Cyprus-type) VMS deposits. Similar geological environments and styles of mineralization have formed relatively large copper-zinc deposits elsewhere in Newfoundland at Tilt Cove (9 Mt of between 1% and 12% copper) and in Cyprus at the Mavrovouni mine (15 Mt of 4% copper with zinc and gold); as noted in Messina Minerals Inc. 9th Year Assessment Report (2009).

 

Copper and zinc massive sulphides were first discovered at York Harbour in 1893. Since then a total of 2,134 metres of documented underground drifting and development have been completed for which documentation is available.  Drill core logs and sampling data is available for a total of 19,323 metres of historical drilling that tested eleven lenses or zones of copper-zinc-silver-gold-cobalt massive sulphide mineralization. These zones occur over a 600-metre strike length and many remain open for expansion both along strike and downdip.

 

Most historical exploration and underground development have been concentrated within a 350- metre long segment of a stratigraphic contact between lower and upper basaltic units, and within 150 metres of surface. An overturned synclinal fold is interpreted to extend and repeat the favourable mineralized horizon along the western portion of the property where surface prospects at the No. 4 Brook showing of copper- and zinc-bearing massive sulphides have been discovered and documented in outcrop but have received very little modern exploration attention.

 

J.D. Blanchflower, P. Geo. is a qualified person in accordance with National Instrument 43-101 who has reviewed and accepted the technical material contained in this news release.

 

For further information:

 

Andrew Lee CEO, President and Director

Telephone: 778-302-2257 | Email: [email protected]

Website: www.phoenixgoldresources.ca

 

Cautionary Statement Regarding Forward-Looking Information

 

This news release may contain “forward-looking information” and “forward-looking statements” within the meaning of applicable Canadian securities legislation. All information contained herein that is not historical in nature may constitute forward-looking information. Forward-looking statements herein include but are not limited to statements relating to satisfactory completion of due diligence and any acquisition under the Option and are necessarily based upon a number of assumptions that, while considered reasonable by management, are inherently subject to business, market and economic risks, uncertainties and contingencies that may cause actual results, performance or achievements to be materially different from those expressed or implied by forward-looking statements. Except as required by law, the Company disclaims any obligation to update or revise any forward-looking statements. Readers are cautioned not to put undue reliance on these forward-looking statements.

 

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.

 

Copyright (c) 2021 TheNewswire – All rights reserved.

Author: Author

Share this article:

Continue Reading

Today’s News

Ameriwest Lithium Railroad Valley Geophysics Results in Staking of Additional Claims

VANCOUVER, British Columbia, Oct. 27, 2021 (GLOBE NEWSWIRE) — Ameriwest Lithium Inc. (“Ameriwest” or the “Company”) (CSE: AWLI) (OTC: AWLIF)…

Share this article:

VANCOUVER, British Columbia, Oct. 27, 2021 (GLOBE NEWSWIRE) — Ameriwest Lithium Inc. (“Ameriwest” or the “Company”) (CSE: AWLI) (OTC: AWLIF) (FSE: 5HV0), a North American lithium exploration and development company, is pleased to announce that based on positive preliminary results from a recent geophysical survey, the Company has elected to stake 150 additional placer claims on its Railroad Valley property in Nye County, Nevada.

On August 31, 2021, Ameriwest announced the initiation of a deep target geophysical study designed to determine the presence and depth of conductive and potentially lithium brine-bearing strata. The survey program was undertaken in Q3 2021 by Zonge International Inc. (http://zonge.com) and consisted of a Magnetotelluric (MT) survey. Data was collected along two lines oriented at N90˚E for a total of 12.0-line kilometers. Electric field measurements were made continuously along the lines. Magnetic field measurements were recorded approximately every 1600 meters along each profile. From these measurements a total of 60 magnetotelluric soundings were obtained. See figure 1.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/84e5fc86-3666-4cae-a20d-6f7b3fa7c2f0

As noted in Ameriwest’s news release of April 19, 2021, the Company originally staked 312 unpatented placer claims, totalling 6,240 acres at the Railroad Lithium Property located 100 miles northeast of Tonopah. Upon receipt and analysis of the geophysics data whereby sharp resistivity boundaries in the subsurface are represented as resistivity gradient zones, Ameriwest noted increased resistivity open to the eastern portion of the study. (See Figure 2). Therefore, the Company elected to acquire an additional 150 placer claims on the eastern portion of the existing claim block. The additional claims now increase the Railroad Property from 312 to 462 placer claims and increase the property size from 6,240 to 9,097 acres in total.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/72b5e669-3a29-499e-acf9-36ce6c9c22f7

Railroad Valley was originally identified by the US Geological Survey (USGS) as having potential to host lithium bearing brines in its subterranean aquifers beneath the valley floor. The Valley fits the current geological model and understanding of lithium brine deposit occurrences, (as defined by USGS Open File 2013-1006), and is considered analogous to the highly productive Clayton Valley. While Railroad Valley offers certain geological similarities to Clayton Valley, it differs in that it represents a new and virtually unexplored target, with only a handful of companies present, unlike Clayton Valley’s numerous leases and complex water issues. Based on seismic surveys, the Valley is about three times the size of Clayton Valley.

David Watkinson, Ameriwest’s President & CEO, notes, “The results from our geophysics study were extremely compelling. So much so, that we felt that procuring additional leases was of paramount importance. As noted previously, this is one of Nevada’s largest trapped drainage basins and has geologic potential to host large lithium brine deposits. Given its comparative attributes to Clayton Valley and its potentially much greater size, the initial results from our study are a very optimistic first step for Ameriwest’s lithium exploration in the southern portion of the Railroad Valley basin.”

Greg Bell, P.E. (Arizona), a qualified person under the NI 43-101 instrument, has reviewed and approved the technical content of this release.

Ameriwest invites interested stakeholders and shareholders alike to contact our investor relations team or visit our website and sign-up for regular news alerts which will help provide timely updates of ongoing activities. Company management believes strongly in regular communications, updates, and reports from the field as an important aspect of developing informative and useful engagement as the Company continues to help explore and develop the exciting and rapidly evolving lithium sector.

On Behalf of the Board of Directors,

David Watkinson
President and Chief Executive Officer

For further information, please contact:
Invictus Investor Relations
Tel: +1 (604) 343-8661
[email protected]
https://ameriwestlithium.com/

About Ameriwest Lithium Inc. (CSE: AWLI) (OTC: AWLIF) (FSE: 5HV0)

Ameriwest Lithium Inc. is a Canadian-based exploration company with a focus on identifying strategic lithium mineral resource projects for exploration and development. The Company is currently focused on exploring Nevada’s Deer Musk East property, located in the prolific Clayton Valley, totalling 5,600 acres, the Railroad Valley property, totalling 9,097 acres, the Edwards Creek Valley totalling 16,940 acres and Arizona’s Thompson Valley totalling 2,859 acres. Additionally, Ameriwest’s current resource portfolio includes the ESN Project, located in White Pine County, Nevada, and the Koster Dam property, located in the Clinton Mining Division of British Columbia, in which Ameriwest has a 45% interest.

For more information visit: https://ameriwestlithium.com/.

Caution Regarding Forward-Looking Information

Certain statements contained in this news release may constitute forward‐looking information. Forward‐looking information is often, but not always, identified by the use of words such as “anticipate”, “plan”, “estimate”, “expect”, “may”, “will”, “intend”, “should”, and similar expressions. Forward‐looking information involves known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward‐looking information. The Company’s actual results could differ materially from those anticipated in this forward‐looking information as a result of regulatory decisions, competitive factors in the industries in which the Company operates, prevailing economic conditions, changes to the Company’s strategic growth plans, and other factors, many of which are beyond the control of the Company. The Company believes that the expectations reflected in the forward‐looking information are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward‐looking information should not be unduly relied upon. Any forward‐looking information contained in this news release represents the Company’s expectations as of the date hereof and is subject to change after such date. The Company disclaims any intention or obligation to update or revise any forward‐looking information whether as a result of new information, future events or otherwise, except as required by applicable securities legislation.

The Canadian Securities Exchange has not in any way passed upon the merits of the matters referenced herein and has neither approved nor disapproved the contents of this news release.

 




Author: Author

Share this article:

Continue Reading

Trending