Connect with us

Today’s News

Initial Exploration to Start on the Victoria Property in Central Newfoundland

VANCOUVER, British Columbia, Sept. 15, 2021 (GLOBE NEWSWIRE) — Xali Gold Corp. (TSXV:XGC) ("Xali Gold” and/or the “Company”) is pleased to announce…

Share this article:

Published

on

VANCOUVER, British Columbia, Sept. 15, 2021 (GLOBE NEWSWIRE) -- Xali Gold Corp. (TSXV:XGC) ("Xali Gold” and/or the “Company”) is pleased to announce that exploration is planned to commence next week on the Victoria Property located in Central Newfoundland.

Exploration will commence with an initial prospecting trip to the area where gold-bearing quartz veins hosted by altered granitoid-type (felsic) rocks were previously discovered and high grades of gold were found in two heavy mineral concentrate (“HMC”) samples. Prospecting will also be conducted in areas where geophysical anomalies indicate structures which could control mineralization.

The mineralized veins found to date occur at the southern part of the property near the lake shore. Lake levels are low at this time of year which should allow more exposures of bedrock than other times of year.

“It will be great to have a team on the ground to confirm what was discovered previously and look for additional evidence of gold mineralization and the many geological features typical of gold deposits in Newfoundland,” stated Joanne Freeze, President and CEO of Xali Gold.

The geological features identified on the property, which are typical for some of the recently discovered gold deposits in Newfoundland including Marathon Gold’s (“Marathon”) Valentine Lake deposit (see Victoria Claims and Geology Map) as detailed below will also be investigated.

  • The southern portion of the property is underlain by the footwall rocks of the Victoria Lake Shear Zone, which are host to several recently discovered gold deposits;
  • The Rogerson Lake Conglomerate, which is a stratigraphic marker unit for the orogenic gold mineralization at other locations, has been mapped across Victoria Lake a short distance from Xali Gold’s Victoria Property;
  • The granitoid intrusives are interpreted to be fault bound, which is also a typical setting for gold mineralization regionally.

Xali Gold’s new Victoria Property is located just 3 kilometres (“km”) southwest of Marathon’s Valentine Gold Project (see Newfoundland Map). Marathon has defined (Measured and Indicated) resources of 3.14 million ounces (“Moz”) gold and Inferred resources of 1.00 Moz (https://marathon-gold.com/valentine-gold-project/) and mine construction is expected to commence in early 2022. *There are no assurances that similar results would be obtained on Xali Gold’s Victoria Property.

The Company recently entered into an option agreement to acquire 100% interest in the Victoria Property (see News Release 097 dated July 14, 2021).

About Xali Gold

Xali Gold has launched a comprehensive growth strategy to acquire gold and silver projects with near surface exploration potential, near-term production potential and previous mining histories. Xali Gold plans to advance our growing bank of gold and silver assets internally and/or with industry partners.

The acquisition of the SDA Plant, suitable for treating high grade gold and silver mineralization, along with the acquisition of rights to the El Dorado gold and silver historic mines was the initial step in this strategy. 

The profit-sharing agreement on the potentially leachable Cocula Gold Project was the second step and is a key component of our asset base. In addition to the potential for inexpensive extraction processes such as leaching, it has excellent near surface exploration potential.

The Company is currently evaluating other properties complementary to the SDA plant and El Dorado or stand alone such as the Cocula Gold Project.

El Oro, remains as our flagship asset, as it is a district scale gold project encompassing a well-known prolific high-grade gold-silver epithermal vein system in Mexico. The project covers 20 veins with past production and more than 57 veins in total, from which approximately 6.4 million ounces of gold and 74 million ounces of silver were reported to have been produced from just two of these veins (Ref. Mexico Geological Service Bulletin No. 37, Mining of the El Oro and Tlapujahua Districts. 1920, T. Flores*). Modern understanding of such systems indicates that several of the El Oro district’s veins hold excellent discovery potential.

Xali Gold is dedicated to being a responsible Community partner.

Joanne C. Freeze, P.Geo., President, CEO and Matthew Melnyk, CPG., Director Operations, are Qualified Persons as defined by National Instrument 43-101 for the projects discussed above. Ms. Freeze and Mr. Melnyk have reviewed and approved the contents of this release.

Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release.

Forward-looking Information

This news release may contain forward-looking information (as such term is defined under Canadian securities laws) including but not limited to the potential for discovery on the Victoria, El Dorado, Cocula and El Oro Properties and other statements that are not historical facts. While such forward-looking information is expressed by Xali Gold in good faith and believed by Xali Gold to have a reasonable basis, they address future events and conditions and are therefore subject to inherent risks and uncertainties including those set out in Xali Gold’s MD&A. Factors that cause the actual results to differ materially from those in forward-looking information include, without limitation, gold prices, results of exploration and development activities, regulatory changes, defects in title, availability of materials and equipment, timeliness of government approvals, potential environmental issues, availability of capital and financing and general economic, market or business conditions. Xali Gold expressly disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except in accordance with applicable securities laws.

On behalf of the Board of Xali Gold Corp.

“Joanne Freeze” P.Geo.
President, CEO and Director

For further information please contact:
Joanne Freeze
President & CEO 
Tel: + 1 (604) 689-1957
info@xaligold.com

NR 101


Today’s News

UEX Repays Loan From Denison

 

Saskatoon, Saskatchewan – TheNewswire – September 17, 2021 – UEX Corporation (TSX:UEX)  (OTC:UEXCF) (“UEX” or the “Company”) is pleased…

Share this article:



 

Saskatoon, Saskatchewan – TheNewswire - September 17, 2021 – UEX Corporation (TSX:UEX)  (OTC:UEXCF) (“UEX” or the “Company”) is pleased to announce that the Company has repaid its outstanding term loan (the “Term Loan”) from Denison Mines Corp. (“Denison”).  The Term Loan was used by UEX to purchase JCU (Canada) Exploration Company, Limited (“JCU”), as more particularly described in UEX’s news release dated August 3, 2021.

 

UEX repaid the outstanding balance of C$20.45 million to Denison on September 17, 2021.   Previously, C$20.5 million of the Term Loan was repaid upon UEX transferring 50% of the JCU shares to Denison immediately following the closing of the JCU acquisition (see UEX’s news release dated August 3, 2021).  The shares of JCU owned by UEX that were pledged as security to Denison have been released to UEX.

 

About UEX

UEX is a Canadian uranium and cobalt exploration and development company involved in an exceptional portfolio of uranium projects. 

UEX’s directly-owned portfolio of projects is located in the eastern, western and northern perimeters of the Athabasca Basin, the world's richest uranium belt which in 2020 accounted for approximately 8.1% of the global primary uranium production.  In addition to advancing its uranium development projects through its ownership interest in JCU,  UEX is currently advancing several other uranium deposits in the Athabasca Basin which include the Paul Bay, Ken Pen and Ōrora deposits at the Christie Lake Project , the Kianna, Anne, Colette and 58B deposits at its currently 49.1%-owned Shea Creek Project, the Horseshoe and Raven deposits located on its 100%-owned Horseshoe-Raven Development Project and the West Bear Uranium Deposit located at its 100%-owned West Bear Project.

UEX is also 50:50 co-owner of JCU with Denison.  JCU’s portfolio of projects includes interests in some of Canada’s key future uranium development projects, notably a 30.099% interest in Cameco’s Millennium Uranium Development Project, a 10% interest in Denison Mines Wheeler River Project, and a 33.8123% interest in Orano Canada’s Kiggavik Project, located in the Thelon Basin in Nunavut, as well as minority interests in nine other grassroots uranium projects in the Athabasca Basin.

UEX is also leading the discovery of cobalt in Canada, with three cobalt-nickel exploration projects located in the Athabasca Basin of northern Saskatchewan, including the only primary cobalt deposit in Canada.  The 100% owned West Bear Project hosts the West Bear Cobalt-Nickel Deposit, the newly discovered Michael Lake Co-Ni Zone, and the West Bear Uranium Deposit.  UEX also owns 100% of two early-stage cobalt exploration projects, the Axis Lake and Key West Projects.

FOR FURTHER INFORMATION PLEASE CONTACT

Roger Lemaitre

President & CEO

(306) 979-3849

Forward-Looking Information

This news release contains statements that constitute "forward-looking information" for the purposes of Canadian securities laws. Such forward-looking information is based on a number of assumptions, which may prove to be incorrect. The actual results could differ materially from those anticipated in such forward-looking information as a result of the risk factors including: the timing and content of work programs; results of exploration activities of mineral properties; the interpretation of drilling results and other geological data; and general market and industry conditions. Many of these factors are beyond the control of UEX. Consequently, all forward-looking information contained in this news release is qualified by this cautionary statement and there can be no assurance that actual results or developments anticipated by UEX will be realized. For the reasons set forth above, investors should not place undue reliance on such forward-looking information. Except as required by applicable law, UEX disclaims any intention or obligation to update or revise forward-looking information, whether as a result of new information, future events or otherwise.

Copyright (c) 2021 TheNewswire - All rights reserved.

Continue Reading

Today’s News

American Manganese Files Final Prospectus and Amended Disclosure Documents

VANCOUVER, BC / ACCESSWIRE / September 17, 2021 / American Manganese Inc. (TSXV:AMY)(OTCQB:AMYZF)(FSE:2AM)("AMY" or the "Company") is pleased to announce…

Share this article:

VANCOUVER, BC / ACCESSWIRE / September 17, 2021 / American Manganese Inc. (TSXV:AMY)(OTCQB:AMYZF)(FSE:2AM)("AMY" or the "Company") is pleased to announce that the Company has filed on SEDAR (www.sedar.com) its final short form base shelf prospectus and an amended technical report (the "Amended Technical Report") for its Rocher Deboule mineral property (the "Property"). The Company has also filed and an amended annual information form for the year ended July 31, 2020 (the "Amended AIF").

As a result of a prospectus review by the British Columbia Securities Commission, certain revisions were made to the technical report for the Property which was originally published on October 25, 2020. The Amended Technical Report contains no material differences to the original technical report for the Rocher Deboule Project. The Amended AIF incorporates the executive summary from the Amended Technical Report and is thus accordingly amended; it contains no material differences from the original annual information form filed on June 8, 2021.

About American Manganese Inc.

American Manganese Inc. is a critical metals company focused on the recycling of lithium-ion batteries with the RecycLiCo™ patented process. The RecycLiCo™ patented process was developed to offer a closed-loop and environmentally friendly solution for the recycling of cathode materials used in lithium-ion batteries. The recycling process provides high extraction and purity of cathode metals, such as lithium, cobalt, nickel, manganese, and aluminum. The RecycLiCo™ process was designed with the goal to produce recycled battery products that could be seamlessly and directly integrated into the re-manufacturing of battery cathodes using minimal processing steps.

For more information, please contact:
Larry W. Reaugh
President and Chief Executive Officer
Telephone: 778 574 4444
Email: lreaugh@amymn.com

www.americanmanganeseinc.com
www.recyclico.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain "forward-looking statements", which are statements about the future based on current expectations or beliefs. For this purpose, statements of historical fact may be deemed to be forward-looking statements. Forward-looking statements by their nature involve risks and uncertainties, and there can be no assurance that such statements will prove to be accurate or true. Investors should not place undue reliance on forward-looking statements. The Company does not undertake any obligation to update forward-looking statements except as required by law.

SOURCE: American Manganese Inc.



View source version on accesswire.com:
https://www.accesswire.com/664647/American-Manganese-Files-Final-Prospectus-and-Amended-Disclosure-Documents

Continue Reading

Today’s News

Erin Ventures Announces Proposed Private Placement

VICTORIA, BC / ACCESSWIRE / September 17, 2021 / Erin Ventures Inc. ("Erin" or the "Company") (TSXV:EV) announces that, subject to the approval of the…

Share this article:

VICTORIA, BC / ACCESSWIRE / September 17, 2021 / Erin Ventures Inc. ("Erin" or the "Company") (TSXV:EV) announces that, subject to the approval of the TSX Venture Exchange (the "TSXV"), it intends to complete a private placement offering of up to 6,666,667 units of the Company ("Units") at a price of $0.075 per Unit for gross proceeds of approximately $500,000 (the "Offering").

Each Unit in this Offering will be comprised of one (1) common share in the capital of the Company (a "Share") and one (1) common share purchase warrant (each, a "Warrant"). Each Warrant will have a two (2) year term and will be exercisable into one (1) Share at a price of $0.10.

The Warrants also have an acceleration clause whereby if the Common Shares trade on the TSXV at a price equal or greater than the designated trigger price of $0.15 for more than ten (10) consecutive trading days during the Exercise Period, Erin shall have the right to give written notice to the holder requiring the holder to exercise the Warrant, in whole or in part, within a period of thirty (30) days from the date of receipt of notice from Erin.

The Common Shares and Warrants comprising the Units will be subject to a four-month and one day hold period in accordance with the policies of the TSXV and applicable securities legislation. The Private Placement remains subject to the approval of the TSXV.

The net proceeds from this financing will be used to fund further development of its wholly owned Piskanja boron project in Serbia, and for working capital purposes.

On behalf of the Board of Directors,
Blake Fallis, General Manager

About Erin Ventures
Erin Ventures Inc. is an international mineral exploration and development company with boron assets in Serbia. Headquartered in Victoria, B.C., Canada, Erin's shares are traded on the TSX Venture Exchange under the symbol "EV" and the OTCQB Venture Market under the symbol "ERVFF". For detailed information please see Erin's website at www.erinventures.com or the Company's filed documents at www.sedar.com.

For further information, please contact: 
Erin Ventures Inc. 
Blake Fallis, General Manager 
Phone: 1-250- 384-1999 or 1-888-289-3746
info@erinventures.com
www.erinventures.com

Erin's Public Quotations
Canada
TSX Venture: EV
USA
OTCQB: ERVFF
Europe
Berlin: EKV

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements:
This release contains forward looking statements. The words "believe," "expect," "feel," "plan," "anticipate," "project," "could," "should" and other similar expressions generally identify forward-looking statements. Readers are cautioned not to place undue reliance on these forward-looking statements. These forward-looking statements are subject to a number of risks and uncertainties including, without limitation, variations in estimated costs, the failure to discover or recover economic grades of minerals, and the inability to raise the funds necessary, changes in external market factors including commodity prices, and other risks and uncertainties. Actual results could differ materially from the results referred to in the forward-looking statements.

SOURCE: Erin Ventures Inc.



View source version on accesswire.com:
https://www.accesswire.com/664589/Erin-Ventures-Announces-Proposed-Private-Placement

Continue Reading

Trending